
Support the project with paypal
| Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
|---|---|---|---|---|---|---|---|
| Д-453 [D-453], 1994- ПСКР-... [PSKR-...] | 310 | 60-letiya SSSR SYd, Khabarovsk | 1985 | Board Guard 1994, stricken 2004 | |||
| Д-458 [D-458], 1994- ПСКР-... [PSKR-...] | 311 | 60-letiya SSSR SYd, Khabarovsk | 4.1987 | Board Guard 1994, stricken 2004 | |||
| Д-259 [D-259], 1994- ПСКР-... [PSKR-...] | 312 | 60-letiya SSSR SYd, Khabarovsk | 10.1987 | Board Guard 1994, stricken 2004 | |||
| Д-285 [D-285], 1994- ПСКР-... [PSKR-...] | 313 | 60-letiya SSSR SYd, Khabarovsk | 1988 | Board Guard 1994, stricken 2004 | |||
| Д-447 [D-447], 1994- ПСКР-... [PSKR-...] | 314 | 60-letiya SSSR SYd, Khabarovsk | 1989 | Board Guard 1994, stricken 2004 | |||
| Д-323 [D-323], 1994- ПСКР-... [PSKR-...] | 315 | 60-letiya SSSR SYd, Khabarovsk | 1990 | Board Guard 1994, stricken 2004 | |||
| Д-142 [D-142], 1994- ПСКР-... [PSKR-...] | 316 | 60-letiya SSSR SYd, Khabarovsk | 1991 | Board Guard 1994, stricken 1996 | |||
| Д-143 [D-143], 1994- ПСКР-... [PSKR-...] | 317 | 60-letiya SSSR SYd, Khabarovsk | 1992 | Board Guard 1994, stricken 2004 |
| Displacement standard, t | 132 |
|---|---|
| Displacement normal, t | 149 |
| Length, m | 31.3 |
| Breadth, m | 12.9 |
| Draught, m | 1.00 / 0.00 |
| No of shafts | 2 air propellers |
| Machinery | 2 MT-70K gas turbines for lift and propulsion |
| Power, h. p. | 20000 |
| Max speed, kts | 55 |
| Fuel, t | gas turbine oil |
| Endurance, nm(kts) | 200(50) |
| Armament | 1 x 4 Igla-1 SAM (16 9K310), 2 x 6 - 30/54 AK-306, 2 x 1 - 30 BP-30 Plamia grenade launchers, 10 - 24 mines |
| Military load | 1 main battle tank or 2 light tanks or APC or 130 troops or 42 t of cargo |
| Electronic equipment | Lazur', MR-244-1 Ekran-1 radars |
| Complement | 12 |
Lengthened version of Project 1206.
None.
In 1994 all craft were transferred to Board Guard on Amur.

