
Support the project with paypal

| Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
|---|---|---|---|---|---|---|---|
| Bellone | Q102 | Arsenal de Rochefort | 12.1912 | 8.7.1914 | 10.1916 | discarded 7.1935 | |
| Hermione | Q103 | Arsenal de Toulon | 12.1912 | 15.3.1917 | 12.1917 | discarded 7.1935 | |
| Gorgone | Q104 | Arsenal de Toulon | 12.1912 | 23.12.1915 | 7.1916 | discarded 7.1935 |
| Displacement standard, t | |
|---|---|
| Displacement normal, t | 523 / 788 |
| Length, m | 60.6 |
| Breadth, m | 5.40 |
| Draught, m | 3.50 |
| No of shafts | 2 |
| Machinery | 2 Sabathé diesels / 2 electric motors Gorgone: 2 Sulzer diesels / 2 electric motors |
| Power, h. p. | 1640 / 800 |
| Max speed, kts | 14.7 / 9.5 |
| Fuel, t | diesel oil |
| Endurance, nm(kts) | 2300(10) / 100(5) |
| Armament | 1 x 1 - 75/35 M1897, 8 - 450 TT (6 Drzewiecki drop-collars, 2 fwd ext cradles, 8) |
| Complement | 38 |
| Diving depth operational, m | 50 |
Double-hulled submarines, projected by M. Hutter on the basis of Clorinde. Built under the 1912 program. After war they underwent major repair and reconstruction.
1920s, all: diving time was reduced, new periscope was installed.
No significant events.
Many thanks to Wolfgang Stöhr for additional information on this page.

