
Support the project with paypal

| Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
|---|---|---|---|---|---|---|---|
| Крк [Krk] | ДБМ241 [DBM241] | BSO, Split | 1990 | to Montenegro 2006 (Krk) | |||
| Раб [Rab] | ДБМ242 [DBM242] | BSO, Split | 1990 | 18.7.1992 | 19.2.1993 // --- | completed for Croatia (Cetina) | |
| iii | BSO, Split | 19.2.1993 | 17.9.1994 | 9.3.1995 // --- | completed for Croatia (Krka) |
| Displacement standard, t | 700 |
|---|---|
| Displacement full, t | 880 |
| Length, m | 43.9 pp 49.7 oa |
| Breadth, m | 10.2 |
| Draught, m | 2.60 max |
| No of shafts | 2 |
| Machinery | 2 Burmeister & Wain Alpha 10V23L-VO diesels |
| Power, h. p. | 3100 |
| Max speed, kts | 12 |
| Fuel, t | diesel oil |
| Endurance, nm(kts) | 1200(12) |
| Armament | 2 x 2 - 30/71 AK-230, 1 x 4 - 20/90 M-75, 94 mines (SAG-1) instead of cargo |
| Military load | 300 troops, 4 tanks or 7 APC or 460t cargo |
| Electronic equipment | Decca 1290A radar |
| Complement | 33 |
Ro-ro design. Can be used as a minelayer. Had bow and stern ramps with continuous covered vehicle deck.
None.
No significant events.

