
Support the project with paypal

| Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
|---|---|---|---|---|---|---|---|
| Norrköping | T131, 1984- R131 | 369 | Karlskronavarvet, Karlskrona | 16.11.1972 | 11.5.1973 | stricken 9.2005 | |
| Nynäshamn | T132, 1984- R132 | 370 | Karlskronavarvet, Karlskrona | 24.4.1973 | 28.9.1973 | stricken 2004 | |
| Norrtälje | T133, 1984- R133 | 371 | Karlskronavarvet, Karlskrona | 18.9.1973 | 1.8.1974 | stricken 11.1998 | |
| Varberg | T134, 1984- R134 | 372 | Karlskronavarvet, Karlskrona | 2.2.1974 | 13.6.1974 | stricken 11.1998 | |
| Västerås | T135, 1984- R135 | 373 | Karlskronavarvet, Karlskrona | 15.5.1974 | 25.10.1974 | stricken 11.1998 | |
| Västervik | T136, 1984- R136 | 374 | Karlskronavarvet, Karlskrona | 2.9.1974 | 15.1.1975 | stricken 12.1997 | |
| Umeå | T137, 1984- R137 | 375 | Karlskronavarvet, Karlskrona | 13.1.1975 | 15.5.1975 | stricken 11.1998 | |
| Piteå | T138, 1984- R138 | 376 | Karlskronavarvet, Karlskrona | 12.5.1975 | 13.9.1975 | stricken 2004 | |
| Luleå | T139, 1984- R139 | 377 | Karlskronavarvet, Karlskrona | 19.8.1975 | 28.11.1975 | stricken 2003 | |
| Halmstad | T140, 1984- R140 | 378 | Karlskronavarvet, Karlskrona | 28.11.1975 | 9.4.1976 | stricken 2003 | |
| Strömstad | T141, 1984- R141 | 379 | Karlskronavarvet, Karlskrona | 26.4.1976 | 13.9.1976 | stricken 2003 | |
| Ystad | T142, 1984- R142 | 380 | Karlskronavarvet, Karlskrona | 3.9.1976 | 10.12.1976 | stricken 2005 |
| Displacement standard, t | 190 |
|---|---|
| Displacement full, t | 230 |
| Length, m | 42.0 wl 43.6 oa |
| Breadth, m | 7.10 |
| Draught, m | 1.60 hull 2.40 propellers |
| No of shafts | 3 |
| Machinery | 3 Rolls-Royce Proteus gas turbines |
| Power, h. p. | 12900 |
| Max speed, kts | 40.5 |
| Fuel, t | gas turbine oil |
| Endurance, nm(kts) | |
| Armament | 1 x 1 - 57/70 M50 Mk 1, 6 - 533 TT, 1 x 6 - 57 RFL, 4 x 9 ELMA ASWRL, mines |
| Electronic equipment | Scanter 009, 9LV200 Mk 1 radars, ST-240 sonar, AR-700 ECM suite, 2x Philax decoy RL |
| Complement | 27 |
Spica II design. 8 SSMs can be carried if TTs removed or 6 TTs without SSMs or mines instead of missiles and torpedoes.
1982-1984, all: - 4 - 533 TT; + 2 x 2 RBS-15 SSM (4 RBS-15), Sea Giraffe 50HC radar, MARIL 880 CCS, TTs can launch Tp613 wire-guided torpedoes
late 1990s, all: - 4 x 9 ELMA ASWRL, ST-240 sonar
No significant events.

