NAVYPEDIA



HOME
FIGHTING SHIPS OF THE WORLD
RUSSIA / USSR
TORPEDO SHIPS
OGNEVOY destroyers (projects 30, 30K) (1945 - 1950)


Photo



Ognevoy

Ships


Name No Yard No Builder Laid down Launched Comp Fate Modification
Огневой [Ognevoy] (ex-Опасный [Opasnyy])   1056 200 61 Kommunar Yd, Nikolayev // Poti port wks 20/11/1939 12/11/1940 5/4/1945 target 2/1956 project 30
Осмотрительный [Osmotritelnyy]   103 402 Yd, Molotovsk 5/5/1940 24/8/1944 29/9/1947 accommodation ship 4/1958 proejct 30K and incomplete ships
Сталин [Stalin] (ex-Охотник [Okhotnik])   104 402 Yd, Molotovsk 25/6/1940 19/7/1947 29/9/1948 stricken 4/1958 proejct 30K and incomplete ships
Жаркий [Zharkiy] (ex-Опустошительный [Opustoshitelnyy])   120 402 Yd, Molotovsk 25/3/1941 --- --- suspended 19/9/1941 proejct 30K and incomplete ships
Живой [Zhivoy] (ex-Оснащённый [Osnashchonnyy])   121 402 Yd, Molotovsk 25/3/1941 --- --- suspended 19/9/1941 proejct 30K and incomplete ships
Жуткий [Zhutkiy] (ex-Озабоченный [Ozabochennyy])   122 402 Yd, Molotovsk 1941 --- --- cancelled 9/1941 proejct 30K and incomplete ships
Жгучий [Zhguchiy] (ex-Обжигающий [Obzhigayushchiy])   130 402 Yd, Molotovsk 1941 --- --- cancelled 9/1941 proejct 30K and incomplete ships
Жестокий [Zhestokiy] (ex-Охраняющий [Okhranyayushchiy])   131 402 Yd, Molotovsk 1941 --- --- cancelled 9/1941 proejct 30K and incomplete ships
Внушительный [Vnushitelnyy]   3 199 Yd, Komsomolsk-on-Amur 16/10/1940 14/5/1947 29/12/1947 target 4/1958 proejct 30K and incomplete ships
Выносливый [Vynoslivyy]   4 199 Yd, Komsomolsk-on-Amur 29/10/1940 17/11/1947 5/12/1948 target 2/1959 proejct 30K and incomplete ships
Властный [Vlastnyy]   5 199 Yd, Komsomolsk-on-Amur 29/10/1940 15/6/1948 27/12/1948 target 2/1959 proejct 30K and incomplete ships
Ведущий [Vedushchiy]   10 199 Yd, Komsomolsk-on-Amur 1941 --- --- cancelled 9/1941 proejct 30K and incomplete ships
Внезапный [Vnezapnyy]   11 199 Yd, Komsomolsk-on-Amur 1941 --- --- cancelled 9/1941 proejct 30K and incomplete ships
Отличный [Otlichnyy]   538 190 Zhdanov Yd, Leningrad // 189 Ordzhonikidze Yd, Leningrad 2/12/1939 7/5/1947 31/10/1948 target 2/1960 proejct 30K and incomplete ships
Образцовый [Obraztsovyy]   539 190 Zhdanov Yd, Leningrad 2/12/1939 30/10/1947 29/9/1949 target 2/1959 proejct 30K and incomplete ships
Отважный [Otvazhnyy]   540 190 Zhdanov Yd, Leningrad // 194 Marti Yd, Leningrad 30/12/1939 2/1/1948 2/3/1950 stricken 3/1958 proejct 30K and incomplete ships
Одарённый [Odaryonnyy]   541 190 Zhdanov Yd, Leningrad // 194 Marti Yd, Leningrad 30/12/1939 27/12/1948 28/6/1950 training hulk 4/1958 proejct 30K and incomplete ships
Огненный [Ognennyy]   547 190 Zhdanov Yd, Leningrad 30/6/1940 --- --- suspended 10/9/1941 proejct 30K and incomplete ships
Ожесточённый [Ozhestochonnyy]   548 190 Zhdanov Yd, Leningrad 27/7/1940 --- --- suspended 20/7/1941 proejct 30K and incomplete ships
Острый [Ostryy]   549 190 Zhdanov Yd, Leningrad 18/12/1940 --- --- suspended 20/7/1941 proejct 30K and incomplete ships
Ослепительный [Oslepitelnyy]   550 190 Zhdanov Yd, Leningrad 12/1940 --- --- suspended 20/7/1941 proejct 30K and incomplete ships
Осторожный [Ostorozhnyy]   557 190 Zhdanov Yd, Leningrad 30/1/1941 --- --- suspended 20/7/1941 proejct 30K and incomplete ships
Отчётливый [Otchotlivyy]   558 190 Zhdanov Yd, Leningrad 14/2/1941 --- --- suspended 20/7/1941 proejct 30K and incomplete ships
Озорной [Ozornoy]   1087 200 61 Kommunar Yd, Nikolayev 20/11/1939 25/12/1940 9/1/1949 to Bulgaria 3/1950 (Георги Димитров [Georgi Dimitrov) proejct 30K and incomplete ships
Отменный [Otmennyy]   1093 200 61 Kommunar Yd, Nikolayev 30/10/1940 --- --- suspended 20/7/1941 proejct 30K and incomplete ships
Обученный [Obuchennyy] (ex-Обходной [Obkhodnoy])   1094 200 61 Kommunar Yd, Nikolayev 30/12/1940 --- --- suspended 20/7/1941 proejct 30K and incomplete ships
Отчаянный [Otchayannyy]   1095 200 61 Kommunar Yd, Nikolayev 30/12/1940 --- --- suspended 20/7/1941 proejct 30K and incomplete ships
Общительный [Obshchitelnyy] (ex-Отрывистый [Otryvistyy])   1096 200 61 Kommunar Yd, Nikolayev 30/12/1940 --- --- suspended 20/7/1941 proejct 30K and incomplete ships
Организованный [Organizovannyy] (ex-Опорный [Opornyy]   311 189 Ordzhonikidze Yd, Leningrad 21/3/1941 --- --- suspended 20/7/1941 proejct 30K and incomplete ships
Отборный [Otbornyy]   312 189 Ordzhonikidze Yd, Leningrad 21/3/1941 --- --- suspended 20/7/1941 proejct 30K and incomplete ships
Отражающий [Otrazhayushchiy] (ex-Огнедышащий [Ognedyshachiy])   313 189 Ordzhonikidze Yd, Leningrad 19/4/1941 --- --- suspended 20/7/1941 proejct 30K and incomplete ships


Technical data


Data variantpr. 30 pr. 30K
Displacement standard, t

2240

2125

Displacement full, t

2767

2860

Length, m

115.5

117.0

Breadth, m

11.0

11.0

Draught, m

4.68

4.68

No of shafts

2

2

Machinery

2 geared steam turbines sets, 4 KV-30 boilers

2 geared steam turbines sets, 4 KV-30 boilers

Power, h. p.

54000

54000

Max speed, kts

37

36.5

Fuel, t

oil 778

oil 778

Endurance, nm(kts)

3060(18)

3060(18)
Armament

as designed: 2 x 2 - 130/50 B-2LM, 1 x 2 - 76/52 39K, 3 x 1 - 37/63 70K, 4 x 1 - 12.7/79, 2 x 3 - 533 TT, 2 DCR (30), 56 mines

Ognevoy: 2 x 2 - 130/50 B-2LM, 1 x 2 - 76/52 39K, 6 x 1- 37/63 70K, 4 x 1 - 12.7/79, 2 x 3 - 533 TT, 2 DCT, 2 DCR (22), 60 mines

2 x 2 - 130/51 B-2LM, 1 x 2 - 85/52 92K, 6 x 1- 37/73 70K, 2 x 3 - 533 TT, 2 DCT, 2 DCR (22), 60 mines

Electronic equipment

as designed: UZPN hydrophone

Ognevoy: Giuys-1B radar, Tamir-5N sonar

Giuys-1B, Rif-1, Vympel-2, Rym-1 radars, Tamir-5N sonar
Complement

293

301



Standard scale images


<i>Ognevoy</i> 1950
Ognevoy 1950
<i>Vynoslivyy</i> 1950
Vynoslivyy 1950


Graphics


<i>Obraztsovyy</i>
Obraztsovyy
<i>Ognevoy</i>
Ognevoy


Ship project history


In August, 1937, simultaneously with a revision of building program of project 7 destroyers, the decision on creation of new destroyer was made. Requirement given out 15/11/1937 provided armament consisted from 4 130mm, 2 76mm, 4 37mm guns, 4 7.62mm MGs and 3 triple 533mm TTs; 38kts speed, 4000nm endurance. Ship dimensions and machinery structure corresponded to project 7u. The Basic design was developed in two variants: with single and twin 130mm turrets. Instead of 3 triple 533mm TTs both variants should carry 2 quintuple ones. As a result 27/10/1939 project 30 with twin turrets was approved, however 130mm guns remained single purpose in B-2LM turrets.     Prior to the beginning of Great Patriotic War 28 ships were laid down from which 5 destroyers were launched. To the war end only Ognevoy was completed and entered in May, 1945 Black Sea Fleet.     10 more ships were completed in 1947-1950 under modified project 30K with radars and little enhanced AA armament.

Modernizations


None.

Naval service


No significant events.