
Support the project with paypal

| Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
|---|---|---|---|---|---|---|---|
| Río Pativilca | 204 | SIMA, Chimbote | 11.1.2016 | 2016 | in service (2019) | ||
| Río Cañete | 205 | SIMA, Chimbote | 2016 | in service (2019) | |||
| Río Piura | 206 | SIMA, Chimbote | 2017 | in service (2019) | |||
| Río Quilca | 207 | SIMA, Chimbote | 2017 | in service (2019) | |||
| 208 | SIMA, Chimbote | 2018 | building (2019) |
| Displacement standard, t | 465 |
|---|---|
| Displacement full, t | 500 |
| Length, m | 54.5 |
| Breadth, m | 8.50 |
| Draught, m | 2.30 |
| No of shafts | 2 |
| Machinery | 2 Caterpillar 3516C HD diesels |
| Power, h. p. | 6690 |
| Max speed, kts | 23 |
| Fuel, t | diesel oil |
| Endurance, nm(kts) | 3600(14) |
| Armament | 1 x 1 - 30/80 Typhoon Bushmaster II Mk 44, 2 x 1 - 12.7/90 |
| Electronic equipment | 2x radars, Toplite e/o system |
| Complement | 25 |
Design of South Korean STX Offshore SB. 2 fast inspection RIBs can be launched via stern ramp.
None.
No significant events.

