
Support the project with paypal
| Name | No | Yard No | Builder | Laid down | Launched | Comm | Fate |
|---|---|---|---|---|---|---|---|
| Klewang | 625 | Lundin, Banyuwangi | 2005 | 29.8.2012 | --- | fire 28.9.2012 | |
| 626 | Lundin, Banyuwangi | 2016 | 2019 | building (2019) |
| Displacement standard, t | |
|---|---|
| Displacement full, t | 230 |
| Length, m | 62.5 |
| Breadth, m | 16.0 |
| Draught, m | 1.20 |
| No of shafts | 4 waterjets |
| Machinery | 4 MAN diesels |
| Power, h. p. | 7200 |
| Max speed, kts | 35 |
| Fuel, t | diesel oil |
| Endurance, nm(kts) | 2000 |
| Armament | 2 x 2 C705 SSM (4 C705), 1 x 7 - 30/77 type 730 |
| Electronic equipment | 2 radars, SEWACO CCS |
| Complement | 29 |
Futuristic design, stealth wave-piercing trimaran carbon composite hull. Klewang was destroyed by fire being outfitted at shipyard 28.9.2012. Also 11m fast X2K design RIB ia carried.
None.
No significant events.

