
UC1 1940
| Name | No | Builder | Laid down | Launched | Comp | Fate |
| UC1 (ex-B5) | Marinens Hovedverft Horten, Norway | 1925 | 17/6/1929 | 10/1929 // 11/1940 | fire 2/12/1941, never repaired | |
| UC2 (ex-B6) | Marinens Hovedverft Horten, Norway | 1925 | 24/9/1929 | 5/1930 // 11/1940 | stricken 9/1943 |
|
Displacement standard, t |
420 / |
|
Displacement normal, t |
427 / 554 |
|
Length, m |
51.0 |
|
Breadth, m |
5.33 |
|
Draught, m |
3.50 |
|
No of shafts |
2 |
|
Machinery |
2 Sulzer diesel-generators / 2 GE electric motors |
|
Power, h. p. |
900 / 700 |
|
Max speed, kts |
14 / 11 |
|
Fuel, t |
diesel oil 19 |
|
Armament |
4 - 450 TT (bow, 6) |
| Complement |
23 |
| Diving depth operational, m | 50 |
Ship project history: Former Norwegian submarines B5 and B6. Former was captured by German troops 9/4/1940 at Kristiansand and latter 18/5/1940 at Florö.
Modernizations: None.
Naval service: UC1 was damaged 20/12/1941 at Kiel by a fire and stricken 4/1/1942. UC2 was stricken 26/9/1943 and late 1943 was sunk at Bergen as result of sabotage.
© Ivan Gogin, 2008-10