
Support the project with paypal

| Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
|---|---|---|---|---|---|---|---|
| Leitha | Elso Magyar Pest-Fiumei Hajógyár Rt, Újpest | 1870 | 5/1871 | 3/1872 | dredger 1.1921 | ||
| Maros | Elso Magyar Pest-Fiumei Hajógyár Rt, Újpest | 7/1870 | 4/1871 | 3/1872 | BU 1.1921 |
| Data variant | as completed | rebuilding 1893-1894 |
|---|---|---|
| Displacement normal, t | 310 |
310 |
| Displacement full, t | 315 | |
| Length, m | 50.0 |
50.6 |
| Breadth, m | 8.10 |
8.10 |
| Draught, m | 1.10 |
1.10 |
| No of shafts | 2 | 2 |
| Machinery | 2 HSE, 2 cylindrical boilers | 2 VTE, 2 Yarrow boilers |
| Power, h. p. | 700 | |
| Max speed, kts | 8 - 9 |
8 |
| Fuel, t | coal |
coal |
| Endurance, nm(kts) | ||
| Armour, mm | iron; side: 44, deck: 25, CT: 50 | steel; side: 44, deck: 25, CT: 50 |
| Armament | 1 x 2 - 149/18 G. L/21 M.61 |
1 x 1 - 120/33 G. L/35 C.80, 2 x 1 - 47/40 SFK L/44 H, 1 x 1 - 8.80 |
| Complement | 50 - 57 |
59 |
River monitors. Capitally rebuilt in 1893-1894.
Hull was protected by 44mm sides and 25mm deck, CT had 50mm sides.
1893-1894, both: were rebuilt with data as given in the table.
1915, Leitha: - 2 x 1 - 47/40; + 1 x 1 - 66/37 SFK L/42 (Skoda), 1 x 1 - 66/16 G. L/18
1915, Maros: - 2 x 1 - 47/40; + 3 x 1 - 66/16 G. L/18, 3 x 1 - 8.80
No significant events.

